Inbetriebnahme von LED-Fassaden
Inbetriebnahme von LED-Fassaden
Messbare Abnahme vor Übergabe
Acceptance layers
Verify identity, electrical branches, control mapping, optical appearance and records.
Calculation
Illustrative: 120 fixtures × 3 slots = 360 slots; the last start address is 358. Confirm the real personality.
Workflow
- Freeze schedule and thresholds.
- Test every address and channel.
- Measure agreed optical points.
- Close defects with retest evidence.
Do not sign when
- No final address backup.
- RDM discovery is the only evidence.
- No calibrated measurement or approved tolerance.
FAQ and sources
RDM assists commissioning but does not prove optical or electrical acceptance [S2]. Technical reviewer: 待确认.