Puesta en marcha de fachadas LED
Puesta en marcha de fachadas LED
Pruebas medibles antes de la entrega
Acceptance layers
Verify identity, electrical branches, control mapping, optical appearance and records.
Calculation
Illustrative: 120 fixtures × 3 slots = 360 slots; the last start address is 358. Confirm the real personality.
Workflow
- Freeze schedule and thresholds.
- Test every address and channel.
- Measure agreed optical points.
- Close defects with retest evidence.
Do not sign when
- No final address backup.
- RDM discovery is the only evidence.
- No calibrated measurement or approved tolerance.
FAQ and sources
RDM assists commissioning but does not prove optical or electrical acceptance [S2]. Technical reviewer: 待确认.
Author: LikeLight Tom, Operations. Reviewed August 25, 2026.